SMED One day program What is SMED (Single Minute Exchange of Dies)? Setup time is one of the major losses in a manufacturing
CSense Management Solutions Pvt Ltd

Setup time is one of the major losses in a manufacturing unit. Normally, a change over may consume few hour every day. On the lower side, if our one change-over takes one hour, we straight away lose 5% of the shift time. So, usually, production managers will try to avoid the changeovers as much as possible. One of the easiest ways to minimise the loss due to setup time is to increase the batch size. For each order, they calculate the economic order quantity (EOQ) and accumulate orders until the EOQ is reached.
The inflated batch size causes the wastes of Over production, Inventory, Waiting, Over Processing, Transport in the shop floor.
SMED tries to reduce the impact of changeover time by reducing the time taken for the changeover. By reducing changeover times, the organisation can dramatically reduce their batch sizes. The movement of small batches through production line will reduce the waiting time, over production, over processing. This indeed helped Toyota in improving their flow and attain Lean with reduced cash to cash cycle times.

Level of People
Functions
Industry
Learning by
1 Day – 8 Hours
Min 10 and Max 20 Participants per batch
Continued coaching and hand-holding support could be provided by CSense after the workshop for successful project completion, as an optional engagement. We can also extend the support in other areas